Galeria Północna

Reducing the time of information flow plays a cardinal role in the pace of project realisation.

Due to the size and complexity of the investment, GTC S.A. decided to use the think project! Common Data Environment solutions.

Project profile

Located in the Białołęka district, Galeria Północna is the first new shopping centre in Warsaw in many years. GTC Group is both an investor and administrator of Galeria Północna. The building was designed by APA Wojciechowski studio. The contract engineer for the project was HILL International. The general contractor was Unibep S.A. 

In the shopping mall itself, apart from commercial and service premises patrons are also offered: a multi-screen cinema, fitness centre and a playground for children. Galeria Północna is also the first state-of-the-art retail and entertainment centre, possessing a rooftop garden with an area of 5,000 square metres. Furthermore, the building has received the prestigious LEED pre-certification at the GOLD level. 

Due to the size and complexity of the investment, GTC S.A. decided to use the think project! Common Data Environment solutions. Thanks to the think project! solutions, better control of processes was possible, the approval status was constantly updated and access to documents was made fast and simple. All modules utilised for the project proved to work well in practice and as such were used very intensively. 

Experience gained from the usage of the platform provided grounds for drawing the following conclusion – in order to make CDE solutions effective, it is necessary to take into account the specific needs of parties as well as their contractual conditions. As a result, the application of the think project! platform for such a complex and demanding project proved necessary. 

FACTS & FIGURES 

  • Completion 2017 
  • 202,000 square metres total area  
  • 64,000 square metres of commercial area
  • 2,000 parking spaces 
  • 4 above-ground storeys
  • 2 under-ground storeys
  • The first shopping centre in Warsaw with a rooftop garden 

CHALLENGES

  • Convincing all project parties to work with the same CDE tool 
  • Standardisation of drawing numbering 
  • Implementation of numerous processes

RESULTS ACHIEVED

  • Faster approval and evaluation processes (for drawings, RFI, material data, samples, change orders)
  • Full control over processes 
  • Enforcement of applying implemented processes
  • Continuous updates of approval status 
  • Quick access to documents  

MODULES & SERVICES UTILISED

  • Execution Design and Shop Drawing Management 
  • Requests for Information (RFI) 
  • Document Management 
  • Transmittal
  • Submittal
  • General Inspection Requests
  • Material Submittal
  • Method Statement
  • Requests for Subcontractor Approval
  • Non-Conformance Reports, NCR 
  • Change Orders
  • Tenant Change Orders

 

Facts

Industry
Trade & Service
Project type
Building Construction
Asset owner/ Client
GTC S.A.
Location
Google Maps
close
VAMED Vitality World - Thermal bath Laa
Bruckner Tower
New Fire Station
Residing at Kirchplatz
Apartment Building, Lindengasse
Desalination Plant Tuas 3
A4 Ost Autobahn (motorway)
Miguillas hydroelectric power plants
Defect Management (Acceptance / Warranty)

Use of cookies

Our website uses cookies and other technologies to make your website experience better and to help us understand how you use our website. Please click “accept” to continue or “deny” to deactivate non-functional Cookies. The full website experience cannot be ensured, when Cookies are deactivated due to technical reasons. Learn more about Cookies in our data protection statement.


Your current settings
Cookies are active Non-functional cookies are disabled