© C. F. MØLLER A/S
© C. F. MØLLER A/S
© Ed. Züblin AG

think project! supports design management in Züblin project

Together with clothing manufacturer BestsellerA/S and logistic partner TGW, Züblin is constructing a new logistic centre in Haderslev, Denmark as a partnering project.

Total gross floor space: 48,570 m²
Construction sum: 36.56 million euros
Planned completion: March 2012

The construction of a logistic centre, consisting of two high-rack warehouses, a sorting terminal, loading terminal, technology building and outdoor facilities, is planned.

Individual, prompt handling of drawing management

To handle the provision and sending of drawings and plans, as well as the creation of plan and distribution lists, promptly and on an individual basis, Züblin decided to use the online project collaboration platform think project!.

With the support of the project platform, large volumes of data can now be sent easily, and thanks to the digitalized sending of design documents, practically no more hard copies are required, saving time and costs. In addition, the encoding of design documents has led to a structured method of working that makes well-organised drawing management possible. Every drawing or plan received and sent is documented, and the process therefore remains traceable.

Back

Haderslev/ DenmarkLogistic centre

IndustryTrade & Service
Project typePlant construction
ClientBestseller A/S
CustomerEd. Züblin AG
LocationGoogle Maps